We’ve recently been able to have the ‘spare’ 20 tons of stone stacked at this pool spread and levelled – to complete/extend the car park and extend the surfaced path along one of the banks.
We’ve also been able to specifically improve access for disabled members by slightly widening one of the ramps from the car park down to the disabled pegs.